IRO Critical Path long Arm Upgrade?
Old School CF Moderator
Joined: May 2010
Posts: 9,652
Likes: 3
From: Chattanooga
Year: 2001
Model: Cherokee
Engine: 4.0
Your right the discussion will continue..but if it the *****ing doesnt stop then I will lock the thread

So..with that said.
Lets continue to discuss these different long arm setups..minus the BS.
CF Veteran
Joined: Jan 2013
Posts: 1,053
Likes: 2
From: columbia, pa
Year: 2000
Model: Cherokee
Engine: 4.0
Installed my 4.5 Rc lift but those short arms are a rough ride and I know I could do the drop bracket but Id much rather just do it right and upgrade to long arm. All I want is to upgrade to long arm so this kit should be all I'd need right? http://www.ironrockoffroad.com/Merch...egory_Code=PFX
CF Veteran
Joined: Nov 2011
Posts: 7,387
Likes: 10
From: City of Trees, CA
Year: 93 2 door
Model: Cherokee
Engine: 4.0
If a companys parts or services are crap then no rep needed to push there garbage ! IRO sells RC some of there stuff is junk ! People still buy it .
Last edited by Aljay; Mar 29, 2013 at 10:15 PM.
Member
Joined: Dec 2012
Posts: 176
Likes: 0
From: Santa Cruz, CA
Year: 1995
Model: Cherokee
Engine: 4.0
There customer service was great, as well as they do not sell garbage products.
I am in the middle of installing their front recovery system which is super beefy, and when I called with questions they gladly took the time to help me with everything
.
Have you purchased stuff from them before?
There customer service was great, as well as they do not sell garbage products.
I am in the middle of installing their front recovery system which is super beefy, and when I called with questions they gladly took the time to help me with everything
.
There customer service was great, as well as they do not sell garbage products.
I am in the middle of installing their front recovery system which is super beefy, and when I called with questions they gladly took the time to help me with everything
.
Member
Joined: Dec 2012
Posts: 176
Likes: 0
From: Santa Cruz, CA
Year: 1995
Model: Cherokee
Engine: 4.0
Not offended at all, haha. Just saying their products are pretty dang nice.
I ordered something from rc once, I learned my lesson...Not only poor product but very poor customer service from rc.
I ordered something from rc once, I learned my lesson...Not only poor product but very poor customer service from rc.
Did lots of reading before I bought my lift got a smoking deal , all I hear now is but you could be 1.5 inchs taller bla bla bla . Lol , I am going with IRO HnT tho .
Last edited by Aljay; Mar 29, 2013 at 11:03 PM.
Member
Joined: Dec 2012
Posts: 176
Likes: 0
From: Santa Cruz, CA
Year: 1995
Model: Cherokee
Engine: 4.0
Luckily I did not buy anything big from them, I pieced together my kit together with mostly RE parts.
The last pieces I need are control arms, which I was leaning toward IRO's interesting long arm kit. I know I am going long arm, I am still trying to decide what kit as it is going to be my daily and weekend wheeler... Sorry everyone for going off topic... back to long arm discussion etc...
The last pieces I need are control arms, which I was leaning toward IRO's interesting long arm kit. I know I am going long arm, I am still trying to decide what kit as it is going to be my daily and weekend wheeler... Sorry everyone for going off topic... back to long arm discussion etc...
Luckily I did not buy anything big from them, I pieced together my kit together with mostly RE parts.
The last pieces I need are control arms, which I was leaning toward IRO's interesting long arm kit. I know I am going long arm, I am still trying to decide what kit as it is going to be my daily and weekend wheeler... Sorry everyone for going off topic... back to long arm discussion etc...
The last pieces I need are control arms, which I was leaning toward IRO's interesting long arm kit. I know I am going long arm, I am still trying to decide what kit as it is going to be my daily and weekend wheeler... Sorry everyone for going off topic... back to long arm discussion etc...
CF Veteran
Joined: Jan 2013
Posts: 1,053
Likes: 2
From: columbia, pa
Year: 2000
Model: Cherokee
Engine: 4.0
CF Veteran
Joined: May 2012
Posts: 1,209
Likes: 5
From: Puyallup wa
Year: 1999
Model: Cherokee
Engine: 4.5L Stroker
I dont see why you couldnt modify top of arm/axle mount to accept a larger bolt. If iro would get on here and see all this feed back tney might change arm and add modifying stock mount to there kit . This would shut up all the nay Sayers, right?
Cherokee Forum Vendor
Joined: Mar 2011
Posts: 1,448
Likes: 2
From: Lynden, WA
Year: 1998
Model: Cherokee
Engine: 4.0
The subject of their arms being a fixed length hasn't even been touched yet. There are other features not there left to be desired. Good luck centering your axle in the wheel well to your liking or adding 1-2" of stretch like a lot of guys do. T case skid. Removable 3 piece crossmember.


