Jeep Builds Make your own jeep build thread here, discuss and view jeeps here. All Jeep models are welcome here.
Sponsored by:
Sponsored by:

Iron Rock Off Road XJ 6.5" Critical Path Long Arm Lift Kit

Thread Tools
 
Search this Thread
 
Old 10-29-2013, 06:06 PM
  #211  
Senior Member
Thread Starter
 
n_a_i_w's Avatar
 
Join Date: Jun 2010
Location: Arizona
Posts: 695
Likes: 0
Received 0 Likes on 0 Posts
Year: 2000
Model: Cherokee
Engine: 4.0
Default

Glad it helped out!
Old 11-16-2013, 07:39 PM
  #212  
CF Veteran
 
rtralabama's Avatar
 
Join Date: Aug 2010
Location: Carlisle, PA
Posts: 1,678
Likes: 0
Received 0 Likes on 0 Posts
Year: 2000
Model: Cherokee
Engine: Inline 6
Default

got my LAs installed. i just needa get rid of the stock LCA mounts to they dont rub the new LAs. might have to get test it out tonight though
Old 11-16-2013, 09:03 PM
  #213  
Seasoned Member
 
smdirtrider's Avatar
 
Join Date: Apr 2012
Location: San Antonio/Houston, Texas
Posts: 272
Likes: 0
Received 1 Like on 1 Post
Year: 1988
Model: Cherokee
Engine: 6 cylinder 4.0L
Default

Originally Posted by rtralabama
got my LAs installed. i just needa get rid of the stock LCA mounts to they dont rub the new LAs. might have to get test it out tonight though
I shoulda cut mine off with an angle grinder before I put my LA on. I just heated the old mounts up and hammered them out of the way for now.
Old 11-16-2013, 09:04 PM
  #214  
CF Veteran
 
pmondo's Avatar
 
Join Date: Jan 2013
Location: columbia, pa
Posts: 1,053
Likes: 0
Received 2 Likes on 2 Posts
Year: 2000
Model: Cherokee
Engine: 4.0
Default

Originally Posted by rtralabama
got my LAs installed. i just needa get rid of the stock LCA mounts to they dont rub the new LAs. might have to get test it out tonight though
cool! I like mine
Old 11-17-2013, 03:17 AM
  #215  
CF Veteran
 
rtralabama's Avatar
 
Join Date: Aug 2010
Location: Carlisle, PA
Posts: 1,678
Likes: 0
Received 0 Likes on 0 Posts
Year: 2000
Model: Cherokee
Engine: Inline 6
Default

Little bit of flexin. Shocks measured 26". Ain't flexed em all the way out yet but they ride great offroad, whole lot smoother.
Attached Thumbnails Iron Rock Off Road  XJ 6.5" Critical Path Long Arm Lift Kit-forumrunner_20131117_011512.jpg   Iron Rock Off Road  XJ 6.5" Critical Path Long Arm Lift Kit-forumrunner_20131117_011530.jpg   Iron Rock Off Road  XJ 6.5" Critical Path Long Arm Lift Kit-forumrunner_20131117_011608.jpg  
Old 11-19-2013, 09:59 PM
  #216  
Senior Member
Thread Starter
 
n_a_i_w's Avatar
 
Join Date: Jun 2010
Location: Arizona
Posts: 695
Likes: 0
Received 0 Likes on 0 Posts
Year: 2000
Model: Cherokee
Engine: 4.0
Default

Very nice!!!! As far as the stock control arm mounts. I cut mine off. They will hit.
Old 12-31-2013, 12:06 AM
  #217  
Member
 
dohc91gli's Avatar
 
Join Date: Mar 2013
Location: McMinnville Oregon
Posts: 115
Likes: 0
Received 0 Likes on 0 Posts
Year: 2000
Model: Cherokee
Engine: 4.0
Default

I'm sold on this kit. should be ordering mine within the month. I wont have the cash to do a steering upgrade... but those are the brakes I guess. It should be fine for a while right? I won't be wheeling it hard till I get better steering. Think I'll run 32's.. I don't want to trim my pretty arches or fenders.
Old 12-31-2013, 02:03 AM
  #218  
CF Veteran
 
Future's Avatar
 
Join Date: Jun 2011
Location: Plainfield Illinois
Posts: 1,672
Likes: 0
Received 0 Likes on 0 Posts
Year: 1999
Model: Cherokee
Engine: 4.0L Straight 6
Default

Originally Posted by rtralabama
Little bit of flexin. Shocks measured 26". Ain't flexed em all the way out yet but they ride great offroad, whole lot smoother.
Im running 6.5" with iro long arms. Amazing long arms. But I cant belive your only runnin 26" shocks. Mine are like 32" and I max mine out.
Old 12-31-2013, 02:03 AM
  #219  
CF Veteran
 
Future's Avatar
 
Join Date: Jun 2011
Location: Plainfield Illinois
Posts: 1,672
Likes: 0
Received 0 Likes on 0 Posts
Year: 1999
Model: Cherokee
Engine: 4.0L Straight 6
Default

Iron Rock Off Road  XJ 6.5" Critical Path Long Arm Lift Kit-forumrunner_20131231_020222.jpg



Iron Rock Off Road  XJ 6.5" Critical Path Long Arm Lift Kit-forumrunner_20131231_020240.jpg
Old 12-31-2013, 04:36 AM
  #220  
Seasoned Member
 
smdirtrider's Avatar
 
Join Date: Apr 2012
Location: San Antonio/Houston, Texas
Posts: 272
Likes: 0
Received 1 Like on 1 Post
Year: 1988
Model: Cherokee
Engine: 6 cylinder 4.0L
Default

Originally Posted by Future
What size tires are you running and which shocks? I have 35s and got the Billstien 5125s from IRO for 5.5" lift. Not sure of the length. Yours looks much longer.

Edit: I just reread what you said. You having the 6.5" lift is probly why its longer. I need to stop reading pages on the forum for the night.
Attached Thumbnails Iron Rock Off Road  XJ 6.5" Critical Path Long Arm Lift Kit-img_27596326389902.jpg  

Last edited by smdirtrider; 12-31-2013 at 04:41 AM.
Old 12-31-2013, 11:12 AM
  #221  
CF Veteran
 
Future's Avatar
 
Join Date: Jun 2011
Location: Plainfield Illinois
Posts: 1,672
Likes: 0
Received 0 Likes on 0 Posts
Year: 1999
Model: Cherokee
Engine: 4.0L Straight 6
Default

Originally Posted by smdirtrider

What size tires are you running and which shocks? I have 35s and got the Billstien 5125s from IRO for 5.5" lift. Not sure of the length. Yours looks much longer.

Edit: I just reread what you said. You having the 6.5" lift is probly why its longer. I need to stop reading pages on the forum for the night.
Haha well im running 33s and these shocks I ordered custom. Their 29.7" long plus a stem eliminator ehich adds about 2"
Old 12-31-2013, 11:25 AM
  #222  
Seasoned Member
 
smdirtrider's Avatar
 
Join Date: Apr 2012
Location: San Antonio/Houston, Texas
Posts: 272
Likes: 0
Received 1 Like on 1 Post
Year: 1988
Model: Cherokee
Engine: 6 cylinder 4.0L
Default

Originally Posted by Future
Haha well im running 33s and these shocks I ordered custom. Their 29.7" long plus a stem eliminator ehich adds about 2"
Ah ha. What brand are they and about how much did they run you? They look like bilstien in the picture.
Old 12-31-2013, 11:28 AM
  #223  
CF Veteran
 
Future's Avatar
 
Join Date: Jun 2011
Location: Plainfield Illinois
Posts: 1,672
Likes: 0
Received 0 Likes on 0 Posts
Year: 1999
Model: Cherokee
Engine: 4.0L Straight 6
Default

Originally Posted by smdirtrider

Ah ha. What brand are they and about how much did they run you? They look like bilstien in the picture.
Bilsteins $80 a piece and stem eliminators were $30.
Old 12-31-2013, 11:33 AM
  #224  
Seasoned Member
 
smdirtrider's Avatar
 
Join Date: Apr 2012
Location: San Antonio/Houston, Texas
Posts: 272
Likes: 0
Received 1 Like on 1 Post
Year: 1988
Model: Cherokee
Engine: 6 cylinder 4.0L
Default

Originally Posted by Future
Bilsteins $80 a piece and stem eliminators were $30.
Nice. That's not too bad. I'll keep that in mind for future projects. Thanks!
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
investinwaffles
Modified XJ Cherokee Tech
11
05-18-2021 12:02 PM
studmuffin
Cherokee Chat
16
09-16-2015 07:52 PM

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 


Quick Reply: Iron Rock Off Road XJ 6.5" Critical Path Long Arm Lift Kit



All times are GMT -5. The time now is 08:15 AM.