Iron Rock Off Road XJ 6.5" Critical Path Long Arm Lift Kit
#212
CF Veteran
Join Date: Aug 2010
Location: Carlisle, PA
Posts: 1,678
Likes: 0
Received 0 Likes
on
0 Posts
Year: 2000
Model: Cherokee
Engine: Inline 6
got my LAs installed. i just needa get rid of the stock LCA mounts to they dont rub the new LAs. might have to get test it out tonight though
#213
Seasoned Member
Join Date: Apr 2012
Location: San Antonio/Houston, Texas
Posts: 272
Likes: 0
Received 1 Like
on
1 Post
Year: 1988
Model: Cherokee
Engine: 6 cylinder 4.0L
I shoulda cut mine off with an angle grinder before I put my LA on. I just heated the old mounts up and hammered them out of the way for now.
#215
CF Veteran
Join Date: Aug 2010
Location: Carlisle, PA
Posts: 1,678
Likes: 0
Received 0 Likes
on
0 Posts
Year: 2000
Model: Cherokee
Engine: Inline 6
Little bit of flexin. Shocks measured 26". Ain't flexed em all the way out yet but they ride great offroad, whole lot smoother.
#217
Member
Join Date: Mar 2013
Location: McMinnville Oregon
Posts: 115
Likes: 0
Received 0 Likes
on
0 Posts
Year: 2000
Model: Cherokee
Engine: 4.0
I'm sold on this kit. should be ordering mine within the month. I wont have the cash to do a steering upgrade... but those are the brakes I guess. It should be fine for a while right? I won't be wheeling it hard till I get better steering. Think I'll run 32's.. I don't want to trim my pretty arches or fenders.
#218
CF Veteran
Join Date: Jun 2011
Location: Plainfield Illinois
Posts: 1,672
Likes: 0
Received 0 Likes
on
0 Posts
Year: 1999
Model: Cherokee
Engine: 4.0L Straight 6
#220
Seasoned Member
Join Date: Apr 2012
Location: San Antonio/Houston, Texas
Posts: 272
Likes: 0
Received 1 Like
on
1 Post
Year: 1988
Model: Cherokee
Engine: 6 cylinder 4.0L
Edit: I just reread what you said. You having the 6.5" lift is probly why its longer. I need to stop reading pages on the forum for the night.
Last edited by smdirtrider; 12-31-2013 at 04:41 AM.
#221
CF Veteran
Join Date: Jun 2011
Location: Plainfield Illinois
Posts: 1,672
Likes: 0
Received 0 Likes
on
0 Posts
Year: 1999
Model: Cherokee
Engine: 4.0L Straight 6
What size tires are you running and which shocks? I have 35s and got the Billstien 5125s from IRO for 5.5" lift. Not sure of the length. Yours looks much longer.
Edit: I just reread what you said. You having the 6.5" lift is probly why its longer. I need to stop reading pages on the forum for the night.
#223
CF Veteran
Join Date: Jun 2011
Location: Plainfield Illinois
Posts: 1,672
Likes: 0
Received 0 Likes
on
0 Posts
Year: 1999
Model: Cherokee
Engine: 4.0L Straight 6
Thread
Thread Starter
Forum
Replies
Last Post
investinwaffles
Modified XJ Cherokee Tech
11
05-18-2021 12:02 PM
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)