Stock XJ Cherokee Tech. All XJ Non-modified/stock questions go here XJ (84-01)
All OEM related XJ specific tech. Examples, no start, general maintenance or anything that's stock.

iron rock critical path long arm kit

Thread Tools
 
Search this Thread
 
Old Feb 28, 2009 | 08:28 PM
  #1  
XJersey's Avatar
Thread Starter
Member
 
Joined: Nov 2008
Posts: 133
Likes: 0
From: New Jersey
Year: 2001
Model: Cherokee
Engine: 4.0L
Default iron rock critical path long arm kit

anyone have any infor on this kit? seems pretty cheap for a 6.5" long arm system...


i was going to pick up the RC 6.5" short arm kit until i came across this.... any input??


http://www.ironrockoffroad.com/Merch...egory_Code=PFX
Reply
Old Feb 28, 2009 | 08:41 PM
  #2  
richxj89's Avatar
Seasoned Member
 
Joined: Dec 2008
Posts: 434
Likes: 1
Year: 1989
Model: Cherokee
Engine: 4.0L renix
Default

i dont like the fact that its not adjustable and it uses stock style bushings.

its probably better than the short arm kit though
Reply
Old Feb 28, 2009 | 09:25 PM
  #3  
XJersey's Avatar
Thread Starter
Member
 
Joined: Nov 2008
Posts: 133
Likes: 0
From: New Jersey
Year: 2001
Model: Cherokee
Engine: 4.0L
Default

yes i was thinking the same thing...although i would get the drop brackets for the short arm kit...i like that the rc kit is fully adjustable
Reply
Old Feb 28, 2009 | 09:29 PM
  #4  
a1racer's Avatar
CF Veteran
 
Joined: Feb 2009
Posts: 7,244
Likes: 0
From: socal
Year: 2000
Model: Cherokee
Engine: 4.0
Default

check out the build thread the on about the rolled xj i believe he is the one with this kit might want to ask him. this is the tread https://www.cherokeeforum.com/f46/pics-xj-rollover-new-91-mj-project-11338/
Reply
Old Feb 28, 2009 | 11:27 PM
  #5  
89eliminator's Avatar
aka Wade-O
 
Joined: Dec 2008
Posts: 3,703
Likes: 10
From: IN
Year: 1989 Comanche
Model: Cherokee
Engine: 4.0
Default

i dont like that kit. it just looks like crap. may work...but it looks like crap
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
srb53150
Modified XJ Cherokee Tech
5
Sep 7, 2015 01:34 PM
John T
Modified XJ Cherokee Tech
20
Sep 6, 2015 09:05 PM
ROCKRIDGE 4WD
Vendor Showcase
0
Sep 3, 2015 05:29 PM

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 



All times are GMT -5. The time now is 02:35 AM.