iron rock critical path long arm kit
#1
Member
Thread Starter
Join Date: Nov 2008
Location: New Jersey
Posts: 133
Likes: 0
Received 0 Likes
on
0 Posts
Year: 2001
Model: Cherokee
Engine: 4.0L
iron rock critical path long arm kit
anyone have any infor on this kit? seems pretty cheap for a 6.5" long arm system...
i was going to pick up the RC 6.5" short arm kit until i came across this.... any input??
http://www.ironrockoffroad.com/Merch...egory_Code=PFX
i was going to pick up the RC 6.5" short arm kit until i came across this.... any input??
http://www.ironrockoffroad.com/Merch...egory_Code=PFX
#3
Member
Thread Starter
Join Date: Nov 2008
Location: New Jersey
Posts: 133
Likes: 0
Received 0 Likes
on
0 Posts
Year: 2001
Model: Cherokee
Engine: 4.0L
yes i was thinking the same thing...although i would get the drop brackets for the short arm kit...i like that the rc kit is fully adjustable
#4
CF Veteran
Join Date: Feb 2009
Location: socal
Posts: 7,244
Likes: 0
Received 0 Likes
on
0 Posts
Year: 2000
Model: Cherokee
Engine: 4.0
check out the build thread the on about the rolled xj i believe he is the one with this kit might want to ask him. this is the tread https://www.cherokeeforum.com/f46/pics-xj-rollover-new-91-mj-project-11338/
Thread
Thread Starter
Forum
Replies
Last Post
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)