iron rock offroad critical path long arms.
Ok so I'm about to build a somewhat streetable toy. I gonna long arm my cherokee and I think k I'm gonna use iron rocks kit. I have done lots of research and I have seen people seriously doubting the caster adjust on the upper Y of the 3 link. But it never seems to be any1 that actually owns the kit. Just options what I want is to hear from people who actually own this lo g arm kit. And if you have had any issues... it's goin on a 99 4 door 4.0.
CF Veteran
Joined: Jul 2011
Posts: 2,164
Likes: 1
From: Warren, Pa
Year: 97
Model: Cherokee
Engine: 4.0L
Ok so I'm about to build a somewhat streetable toy. I gonna long arm my cherokee and I think k I'm gonna use iron rocks kit. I have done lots of research and I have seen people seriously doubting the caster adjust on the upper Y of the 3 link. But it never seems to be any1 that actually owns the kit. Just options what I want is to hear from people who actually own this lo g arm kit. And if you have had any issues... it's goin on a 99 4 door 4.0.
Senior Member
Joined: Jan 2014
Posts: 558
Likes: 1
From: coon rapids MN
Year: 1998
Model: Cherokee
Engine: 4.0 H.O
I'm running iro 5.5in critical path long arms. I haven't had any problems with mine works good rides good I wheel mine around 3 times a month and daily drive it. I would do the 1/2 bolt upgrade on the caster adjustment and flex joint for the upper mount on the dana 30.
Seasoned Member
Joined: Jan 2014
Posts: 484
Likes: 1
From: Oak Lawn, Illinois
Year: 1997
Model: Cherokee
Engine: 4.0
There is a TON of people up here in northern il that run iro long arms that wheel hard and love them. They are definitely on my list for future upgrades.
CF Veteran
Joined: Nov 2011
Posts: 7,387
Likes: 10
From: City of Trees, CA
Year: 93 2 door
Model: Cherokee
Engine: 4.0
OP you're just like every other guy looking at an IRO kit. "Only people who have ran the kit seriously guys."
I don't have to buy a dodge neon to know that it's not a reputable car. You can just read that it's not a good car in your research. Same with anything. I mean if you have to post up and ask us to convince you that IRO arms are ok, do you really want that for your jeep? I'd never talk someone into getting a dodge neon when for a couple dollars more you can have a proven reliable Honda. A lot of people get good use out of rough country gear too. I'm still not buying it for myself.
It doesn't matter what any of us say. This thread has been done a thousand times over and no good has ever come of it. It's like ground hogs day
Hit the google search
I don't have to buy a dodge neon to know that it's not a reputable car. You can just read that it's not a good car in your research. Same with anything. I mean if you have to post up and ask us to convince you that IRO arms are ok, do you really want that for your jeep? I'd never talk someone into getting a dodge neon when for a couple dollars more you can have a proven reliable Honda. A lot of people get good use out of rough country gear too. I'm still not buying it for myself.
It doesn't matter what any of us say. This thread has been done a thousand times over and no good has ever come of it. It's like ground hogs day
Hit the google search
Last edited by Atmos; Jul 31, 2014 at 09:20 PM.
Thread
Thread Starter
Forum
Replies
Last Post
hogluvr
Stock XJ Cherokee Tech. All XJ Non-modified/stock questions go here
7
Sep 16, 2015 08:15 AM
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)



