"Half" lift done
#1
CF Veteran
Thread Starter
Join Date: Oct 2007
Location: W-PA
Posts: 3,883
Likes: 0
Received 6 Likes
on
4 Posts
Year: 2001
Model: Cherokee
Engine: 4.0
"Half" lift done
Yes it's the new lift kit that just came out called the "Half" lift. It consists of 2" RC AAL, alot of rust, drivetrain vibe starter kit, nothing else, and that's it. Very simple 2 hour installation and i was done.
Before:
After:
The homebrew leaf clamps aren't working out too well. I'm gonna tighten them till the springs turn blue. They keep moving around.
I needed to jack up the rear cuz i was carrying my garage in the back of my xj (over 400 lbs of crap). I got just a hair under 3" empty, 2.25" loaded (pictures are shown loaded).
I think i'm gonna stick a 1" spacer up front...or should i go 2" What ya think?
This is just a temporary setup for the next year or two until funds allow a full kit.
Before:
After:
The homebrew leaf clamps aren't working out too well. I'm gonna tighten them till the springs turn blue. They keep moving around.
I needed to jack up the rear cuz i was carrying my garage in the back of my xj (over 400 lbs of crap). I got just a hair under 3" empty, 2.25" loaded (pictures are shown loaded).
I think i'm gonna stick a 1" spacer up front...or should i go 2" What ya think?
This is just a temporary setup for the next year or two until funds allow a full kit.
#5
Thread
Thread Starter
Forum
Replies
Last Post
Sandyman
Stock XJ Cherokee Tech. All XJ Non-modified/stock questions go here
1
09-10-2015 09:21 AM
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)