Jeep Builds Make your own jeep build thread here, discuss and view jeeps here. All Jeep models are welcome here.
Sponsored by:
Sponsored by:

97 ZJ IROR 5.5 Critical Path Build

Thread Tools
 
Search this Thread
 
Old Mar 11, 2014 | 05:08 PM
  #1  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default 97 ZJ IROR 5.5 Critical Path Build

Hey everyone!! I have not been on here in awhile as my last XJ I built I had to sell for financial purposes.. BUT!! I just picked up a 97 ZJ with a 4.0 and 100k on the rebuilt motor and trans for under 1k!!!! I just picked up some 33" BFG's and ordered in the Iron Rock Off Road 5.5 Critical path long arm kit for her...

I wanted to get this up and going and see if anyone out there has any suggestions or comments if they know this kit/install. I put a 6" Long Arm on my XJ alone and went pretty well so I am hoping the ZJ goes the same.

I will start the building thread in the next few days when the kit arrives..

Cheers!!
Reply
Old Mar 31, 2014 | 11:05 PM
  #2  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

So my lift was backordered and finally will be here tomorrow! I regret not doing a good build thread for my last XJ so I will try and make this one as detailed as possible on the ZJ.. What will be covered/installed in this build thread..

-Iron Rock 5.5 Critical Path Long Arm Kit

-Safari Snorkel System

-Iron Rock OTK Steering System (Also backordered, should be here next week but I will keep that install in this thread as well)

The past two days I have blown through 2 large cans of PB on all the components so I am hoping for a decent tear down. Pics to follow tomorrow when the Fed Ex man arrives!
Reply
Old Apr 2, 2014 | 12:30 PM
  #3  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

Jeep stock. Let the games begin...
Attached Images  
Reply
Old Apr 2, 2014 | 12:51 PM
  #4  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

So I got tired of waiting for the Fed Ex guy so I began my Snorkel install. This is one of those weird China snorkels but very impressed with the quality.

1. Pull air cleaner box and trash the stock rubber air duct that leads into air box.

Name:  20140401_124333.jpg
Views: 1554
Size:  45.1 KB

2. Remove the rubber case in the fender well that protects the TPS and trash it.

Name:  20140401_124403.jpg
Views: 1537
Size:  38.9 KB

3. You have to relocate the TPS to the front of the air box to allow room for hose to pass through fender. Easy enough, just remove the bracket and trash it, the TPS fits very well where the old rubber air intake duct used to be.

Name:  20140401_124449.jpg
Views: 1537
Size:  46.5 KB

Name:  20140401_130121.jpg
Views: 1567
Size:  47.8 KB

4. On to the airbox. Kit comes with a metal cover to close the original hole. Comes with template for drilling and rivots. Use ALOT of waterproof sealant.

Name:  20140401_132828.jpg
Views: 1576
Size:  34.8 KB
Reply
Old Apr 2, 2014 | 12:59 PM
  #5  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

After the cover is sealed in place..

Name:  20140401_133601.jpg
Views: 1516
Size:  43.9 KB



Next is the hole drilling in the fender. The kit comes with a template and I used a hole drill until it crapped out, then just broke out the grinder. The good thing about these kits is the air tube that connects under the fender is solid and not that plastic moveable tubing crap..

Name:  20140401_153004.jpg
Views: 1528
Size:  42.1 KB

Airbox back in and relocated TPS

Name:  20140401_153011.jpg
Views: 1592
Size:  46.1 KB

Next make sure to use the template and drill holes snorkel outer fitment. It WILL be tight.. But that is a good thing. The mounting bracket that goes on the A pillar needs to go under the weatherstriping AND under the winsheild holder piece that uses Phillips screws to hold in place.

Name:  20140401_164004.jpg
Views: 1510
Size:  39.8 KB

And it is DONE!

Name:  20140401_172224.jpg
Views: 1552
Size:  48.1 KB

Now on to the lift..
Reply
Old Apr 2, 2014 | 01:03 PM
  #6  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

Here is the Iron Rock Off Road 5.5 Critical Path Long Arm Kit.

Name:  20140401_175159.jpg
Views: 1699
Size:  44.4 KB

The first step after making sure you have everything is to change out the crossmember under the ol' beast. The IRO member is beastly compared to stock..

Name:  20140401_192628.jpg
Views: 1522
Size:  42.7 KB

While I was there I changed out my old Tranny mount as well.. The crossmember uses the two stock holes and bolts on each side, then you drill 4 more 7/16 holes on each side and use provided bolts for added strength..

Name:  20140401_212903.jpg
Views: 1487
Size:  44.1 KB

This is where I got to last night.... I will be continuing today when I get home!!
Reply
Old Apr 2, 2014 | 05:09 PM
  #7  
XJ0nTons's Avatar
Seasoned Member
 
Joined: Jan 2014
Posts: 325
Likes: 1
Model: Cherokee
Default

Here is a pic of my buddy's iron rock 7in on 37s
Attached Thumbnails 97 ZJ IROR 5.5 Critical Path Build-image-2894571569.jpg   97 ZJ IROR 5.5 Critical Path Build-image-4226749269.jpg  
Reply
Old Apr 5, 2014 | 09:56 PM
  #8  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

Very nice!! I just finished the front today, updating the thread soon.. Had a hell of a time with the Iron Y control arm..
Reply
Old Apr 8, 2014 | 01:55 PM
  #9  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

Ok so I finally got some time to post up some pics of the Lift build. After the crossmember was on you start by pretty much tearing apart the front end. I had the most success using a combo of 6-ton jacks under the unibody and used 2-ton for axle support.

Everyone knows this (or should) but I am telling you once again.. PB BLASTER!!! I sprayed down everything for three days prior and the suspension pretty much fell apart, front and rear.. so easily that I missed some pics because I didn't want to loose momentum! This ZJ has nearly 300k on the suspension as well so stuff was tight and corroded pretty bad.

With the ZJ up on the 6-ton stands, it allowed me enough droop that I didn't even need to use the spring compressors to remove or INSTALL the new springs.

Name:  1.jpg
Views: 1456
Size:  36.0 KB

Name:  2.jpg
Views: 1466
Size:  41.5 KB

Name:  3.jpg
Views: 1462
Size:  45.1 KB

Name:  4.jpg
Views: 1443
Size:  40.6 KB

Name:  5.jpg
Views: 1486
Size:  40.4 KB

You can see how worn out the suspension was, so bad the shocks were rubbing the metal on the unibody!! Like I said, everything came out so easily, I didn't even have time for pics on the decon.. PB BLASTER!
Reply
Old Apr 8, 2014 | 02:05 PM
  #10  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

Next the install part begins. First move is to remove the bump stops and cup to add the 3" spacer and re-install with supplied hardware. I also removed the stock coil isolators and replaced the 5/8 stock with 1 3/4 energy suspension isolators. Gives me a little over 6" in the front and support for the upcoming bumper.

Name:  6.jpg
Views: 1478
Size:  37.8 KB

The new double shear track bar bracket went in without a hitch, and I believe the starting length on the front was 33 1/2 inches from center to center on the track bar.

Name:  7.jpg
Views: 1610
Size:  43.3 KB

Next was the springs (which went right in, shocks, and control arm) The control arm was the only thing that gave me problems but after talking with IRO I was able move the upper axle mount bushing just enough to finally squeeze in the bolt. The upper arm munts get tightened to 60 ft lbs and the lowers to 120 ft lbs.

Name:  8.jpg
Views: 1490
Size:  44.6 KB

With the front done on stock tires.

Name:  9.jpg
Views: 1463
Size:  37.8 KB

I began the rear next with the same giant jack stand idea and it worked great. Once again, suspension pretty much fell out of the Jeep.

Name:  10.jpg
Views: 1456
Size:  41.1 KB
Reply
Old Apr 8, 2014 | 02:14 PM
  #11  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

This part went so quick as well I didn't get many pics.. Pretty self guided deconstruction though.. The rear track bar is set to 30 1/2 to start. Both the front and rear axles centered themselves pretty good with these measurements.

Name:  11.jpg
Views: 1523
Size:  54.9 KB

Name:  12.jpg
Views: 1445
Size:  44.8 KB

The same torque specs apply to the rear control arm as the front upper and lowers.

Name:  13.jpg
Views: 1459
Size:  36.7 KB

The finished product on 33x12.50's.. I am not messing with steering yet because Thursday I will be installing IRO's OTK steering kit.

Still need to bleed the brakes but other than that it is set!!

The one issue I am trying to resolve is that the exhaust pipe seems to be rubbing against the oil pan now.. Gonna have to do some tinkering..

Name:  Torque bits.jpg
Views: 1457
Size:  32.4 KB

Get good torque bits.. I stripped two of these harbor freight ones until I went and bought a nice set then the control arms popped right off..
Reply
Old Apr 8, 2014 | 02:43 PM
  #12  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

Before and After....


Name:  20131218_153837.jpg
Views: 1515
Size:  59.3 KB


Name:  20140407_142155.jpg
Views: 2614
Size:  87.7 KB
Reply
Old Apr 11, 2014 | 01:53 PM
  #13  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

Just finished the IRO OTK steering set up and it was a breeze.. Very nice and beefy and the install took less than 2 hours from tear down to alignment. The instructions to do a driveway alignment come with it and I was able to get it within 1/16 which is perfect. Took it down the road at 65 for the first time, very smooth but a little touchy. No vibes either with stock driveshafts on 33's.

Very happy with IRO!!!
Reply
Old Apr 24, 2014 | 03:44 PM
  #14  
nateyz2000's Avatar
Member
 
Joined: Mar 2012
Posts: 120
Likes: 0
From: manteca
Year: 1992
Model: Cherokee
Engine: 4.0 ho
Default

Good write up! Excited to take it out with you!
Reply
Old Apr 29, 2014 | 10:52 AM
  #15  
mwilliams0311's Avatar
Thread Starter
Member
 
Joined: Aug 2013
Posts: 236
Likes: 1
From: Stockton CA
Year: 1990
Model: Cherokee
Engine: I6
Default

Originally Posted by nateyz2000
Good write up! Excited to take it out with you!
Thanks nate!! Im looking forward to breaking her in soon. Finally resolved my knocks and noises. Wel have to get something together soon
Reply



All times are GMT -5. The time now is 05:16 PM.