snokel
i'm plannin' to have a friend at a muffler shop bend up a snorkel for my 90 out of 3". should i incorperate a screen? ideas to tie into air filter box? i'm a metal guy, no pvc for me. we drive through some good brush, i'd rather beat the dents out than replace plastic.
|
i will try and find some pics of the chap in my club in the uk who did just that, works great to
:thumbsup: |
Somewhere on this forum a guy posted a link to an Australian article about a guy who made his own Snorkel , got step by step pics , and it looks the business......have a search for it....
|
2 Attachment(s)
heres a few pics of my mates, he used a comon landy top.:thumbsup:
|
I understand the logic that if it works use it, but flex tubing outside the jeep is a little too redneck looking for me.
Is keeping water out of the intake the only thing you have to worry about when crossing deep water? |
Originally Posted by tkdtim
(Post 205960)
I understand the logic that if it works use it, but flex tubing outside the jeep is a little too redneck looking for me.
Is keeping water out of the intake the only thing you have to worry about when crossing deep water? |
well here is a write up for a home made snorkel
qty description 1 90 deg rubber elbow 2 45 deg rubber elbow 1 3" snorkel head 1 1.5m section of 3" Al tube ( this will be cut in to sections) 2 m6 nutserts 2 m6 x25 screws 1 40x3x60 mm AL flat bar 1 flexible hose 1 3" coupling adaptor for air box 1 length of rubber trim/ edging 6 hose clamps Tools used screw driver 100mm hole saw ( if you can find a 90mm hole saw this would be better but i already had the 100mm) 75mm hole saw drill drop saw friend with a tig welder nutsert gun angle grinder If you can't tig weld i'd suggest just using self tappers to get the flat bar on to the long section. I can't tig weld and dont have AL mig wire so i got a mate to do the tig welding for me if you dont have a nutsert gun, again just use self tappers to the A pillar or rivets I picked up the 3" tube for a 6 pack of beer had the nutserts and screws at home had the flat bar at home the rubber elbows and snorkel head cost me $125 at a truck bits shop. the flexible hose was $20 and the adaptor was like $8 or $10 Anyway the hole thing will cost me around $155 just going to put up pics of it fully assembled as it's pretty self explanitory, on and only half way through with it. Tube lengths so far, this is approximates as you can be a bit off and it dosnt really matter 18" for long bit (along the A pillar) 13" for horizontal bit 4.5" for the vertical bit (attaching to snorkel head) I suggest you assemble the snorkel first then put it up to the guard to decided where to drill. you have to drill through 3 sheet metal layers. First one is super easy as it's flat. Second layer is a nightmare. i suggest drilling all the way through with a pilot drill so you can locate the hole saw for all 3 layers. once all the holes are drilled, go over with paint so they dont rust. and fit the edging on the outermost hole. good luck with the drilling. I had to do some cutting with the angle grinder as the second layer was too much for the hole saw. hope this helps |
All times are GMT -5. The time now is 04:24 PM. |
© 2024 MH Sub I, LLC dba Internet Brands